Archive for November 2014

Barb Gecas on Cover of Minnesota Trails Magazine

Hestons Lodge and Banadad Trail Association Board member Barb Gecas is on the front cover of the current Minnesota Trails Magazine. Her daughter is following her in the picture.

Barb Gecas and daughter on Gunflint Nordic Trails

Barb Gecas and daughter on Gunflint Nordic Trails

Some Snow on Trail but Need More

Yesterday eleven members of Minnehaha Academy’s Nordic Ski Team lead by their coach, Anne Rykken, worked on clearing the west end of the Banadad.. The kids on the team thought the work was great fun.-

On the westend there is about 1-2″ of snow. Not near enough snow to get onto that end of trail with equipment. However, on the east end the snow measures 3-4 inches. Four inches is almost enough, but not quite enough, to get out onto the trail and start packing. While the snowmobiles are out  packing the packing crew will work on clearing the down trees remaining on the  remote section of the east end just beyond the Logging camp.

Help Clear the Downed trees on the Banadad

GiveMn-Give to the max day -November 13

A wind storm this summer dropped hundreds of trees down across the Banadad within the BWCA. We are working on clearing these trees .

While the Banadad Trail Association recently received a $5,000 grant from the US Forest Service to help pay for this work, we have to match those funds with 35% of that amount in order to access the funds. The Banadad Trail Association needs your help so we can clear the remaining 3-4 miles of Trail and get the Banadad open for skiing this winter.

We are turning to outdoor enthusiasts, skiers, and other who love the Banadad Trail and asking if you can help support this work with a donation.  If you are able,  please donate to the Banadad Trail at Giving to max day – November 13 –  GiveMN.  Thanks

July Storms Litter Trail With Trees

“Imagine going out for a lovely ski on the Banadad Ski Trail and coming across a very large clump of down birches, balsams and a twenty inch aspen flanked by two other large aspen blocking the trail. And by the way you are in the BWCA. To remove these trees it took six people using hand saws and sweat labor over five hours.” States Linda Bosma, Banadad Trail Association former president write up for GiveMN.

tree clump

These six person volunteer crew started at the Banadad eastern trail early in the morning. According to members of the crew; “We cut some eight down trees blocking the trail before we even got to this intimidating clump.” After removing this clump three more trees were cut by the sawyers as they travel west along the trail. Others in this crew assisted with the down trees then tackled the high balsam and spruce branches on the trails side. After putting in a full day this crew had cleared a little over a mile of the trail’s eastern end.

completed

This was just one of the accomplishments the Banadad Trail Association can brag about when eighteen volunteer attended the Association’s annual volunteer trail work day. In addition to the crew working on the trail’s first mile, two other crews worked on other sections of the trail.

The second group of six volunteers walked two half miles to the Lizz Lake Portage, outside the BWCA where the side brush had not been trimmed for many years. They spent the day cutting back the large alder side brush. Two members of this crew wearing rubber boots waded through a foot and one half deep swamp to trim back the brush further down the trail.  After a day of trimming this group had opened up about a quarter of a mile of the trail beyond Lizz Lake Portage.

The volunteer’s third group brought up the rear trimmed mostly conifer side brush and branches which last year was a major problem when heavy snow made these branches lean down into the trail.

After the day’s work was complete Andy Jenks, the Association’s president stated; “that a lot had been accomplished and it was a great day on the trail today”.

Andy continued, “But there still is much more to do. A storm went through six to eight remote interior miles of the trails eastern section this past summer leaving hundreds of trees down across the trail. This section of the Trail because of the distance can not easily be reached by our volunteers so a paid contractor is working on clearing this section. Thus far the cost to clear two and one half miles has been over $1500 and we still have many miles go. While a $5000 USFS grant is helping to pay for this work we must raise and contribute 35% of the costs in cash ourselves.

group

Andy emphasized, “We really need you help to pay for this work, please log-in and donate to the Banadad’s trail work at GiveMN.